Second, the station construction area County government, the sanitation bureau, the first aid divides central, the first-aid station enthusiasm; 建站区县政府、卫生局、急救分中心、急救站的积极性;
Optimization of Construction Schemes of Diversion Tunnel in Jinping Second Cascade Hydropower Station 锦屏二级水电站导流隧洞施工方案优化
Numerical simulation of rockburst on the drain tunnel in the Jinping Second Level Hydropower Station Concentrations and Congener Profiles of PCDDs/ PCDFs in Flue Gas Samples from Oil Type Crematories 锦屏二级水电站施工排水洞岩爆数值模拟燃油式火化机排放烟气中二恶英类污染水平和排放特征
This audio diary is in the second large train station – the one in which the train car doesn't fall to the ground. 此音频的日记是第二大火车站,火车车厢的不落在地上。
Probe into the Hydrologic Data Compilation of Fenhe Second Dam Hydrologic Station 汾河二坝水文站水文资料整编的探讨
The paper analyses causes of poor heat supply of second heat exchange station in Heping Street and puts forward schemes of improvement. 分析了大同煤矿集团公司和平街第二热交换站供热差的原因,提出了改进方案。
Abstract The rock burst prediction research in the tunnel of the second grade hydraulic power station is given by using the finite element numerical method. 文章介绍了在天生桥二级水电站隧硐中用有限元方法进行的岩爆数值预测研究工作。
Is article expatiate the characteristics and configuration of S7-400 programable logic controller and the application of PLC control system at the second-steel argon station of 2-4th furnace. 阐述S7-400可编程序控制器控制系统的特点、配置和系统功能及在马钢第二炼钢厂2-4炉吹氩站控制系统中的应用。
Application of PLC in the Reform of Automatic System in SiYang Second Pumping Station PLC在泗阳第二抽水站自动化系统改造中的应用
Prototype Test on Pump Unit Performances of Jiangdu Second Pump Station in the Source of the South-North Water Project 南水北调源头江都第二抽水站原型性能试验研究
The selection of south ( north) circuit railway of Xian pivot and position of the second passenger station 西安铁路枢纽南(北)环线及第二客站位置的选择
Study on the water resources regulation for the second pumping station in Huaiyin 淮阴二站抽水水源调度方案研究
Design and Construction of Foundation Treatment of the Second Jiquan Pumping Station 娘子关提水工程集泉二泵站基础处理设计与施工
The article expounds the design and construction of broken stones vibration pile of the first and second grade pump station's project of leading Huanghe River's water into Shanxi province. And it advances the method of test pile. 本文阐述了山西省万家寨引黄入晋工程的一、二级泵站工程碎石挤密振冲桩复合地基的设计与施工,并提出了桩检验的方法。
Feasibility Study on Power Generation in Reverse in Siyang Second Pump Station 泗阳第二抽水站反向发电可行性研究
Computer monitoring& control system of the second pumping station of Siyang 泗阳二站计算机监控系统
The longitudinal structure will be composed of four layer structure of the central station of the system~ the second main station~ distribution terminal~ LV metering system, that's: LAN, MAN, medium voltage network and low voltage metwork; 纵向结构由系统中心主站至二级主站至配电终端再到低压用电抄表的四层式结构组成,即局域网、城域网、中压网及低压网;
This thesis investigates the design and development of intelligent schedule system of the second pumping station in water treatment plant. 本文主要研究了水厂二级泵房智能调度系统的设计与开发。
A hand is about architectural design and environmental art relationship, the second hand about the station environment art design inside, the third points off the environment for the art design. 一为车站建筑设计与环境艺术设计之间的关系,二为车站内空间环境艺术设计,三为站场外空间环境艺术设计。
Discussion on the renovation of urban center railway station-examples for Nanjing Station and Shanghai Second Station 城市中心火车站改造初探&以南京客站和上海二客站为例
A Test Research on the Axial Pump Model Equipment of the Huaiyin Second Pump Water Station 淮阴第二抽水站轴流泵模型装置的试验研究
Throught the energy performance model test of Si Yang Second Pump Station's pump used as power generation in reverse. 通过泗阳二站水泵的反向发电能量性能模型试验,详细分析了水泵在不同水头和不同转速下的发电性能。
The purifying technics of boiler water supply in the Second Heating Station, Xinzhuang Industrial Park and its main design parameters of purifying building are described. The working principles and treatment characters of the integral water-cleaner are introduced in detail. 作者简要阐述了上海莘庄工业开发区第二热供站锅炉给水净化处理工艺以及各净水构筑物的主要设计参数,并对一体化净水器的工作原理以及工艺特点作了详细的介绍。
Study on Eco-Environmental Water Demand about the Segment of Water Reduced for the Jinping Second Class Hydropower Station of Yalong River 雅砻江锦屏二级水电站减水河段生态环境需水研究
The computer monitoring& control system of Zherong second-cascade hydropower station in Fujian 福建柘荣龙溪二级电站的计算机监控系统
The purpose of the second water pumping station optimum is to consume energy at least on the condition of meeting required flow, lift and given constant pressure, and to utilize fully high-efficient active section of every pump at the same time. 供水泵房最优调度的目的是在尽量满足所要求的流量、扬程和给定恒压供水的压力的条件下,达到耗能最少,同时也要充分利用各泵的高效工作段;
Secondly, researched control system design in detail, designed the first pumping station and second pumping station control system separately, related on the communication between the two pumping stations. 其次,对控制系统的设计进行了详细的研究,分别对一级泵站和二级泵站的控制系统进行了设计,对两级泵站之间的数据通讯进行了详细叙述。
The major works in the dissertation are as the following: Firstly, according to the power load forecasting results of the user and some influencing factors, the comprehensive planning and design of the second class electricity station are proposed. 本文的主要工作如下:首先,根据电站用户用电负荷预测结果及电站地质条件、工程规模等影响因素,对二级电站规划设计,给出了总体布置及详细的建筑物设计方案。
The second quarter is power station personnel management system overall objectives. 第二节电站现场人员工作管理系统总体目标。